Whitepaper: Are Power Curve Upgrades Worth It?
Measuring the ROI for Power Curve Upgrades In this whitepaper, we provide our insights about what considerations you need to make to accurately...
In 2018, WindESCo was engaged by Longroad Energy to optimize the performance of a recently acquired 145 MW wind farm.
WindESCo worked closely with the project owner to increase the value of their investment by improving annual plant revenue by $3,000/MW or $430,000 per year.
Measuring the ROI for Power Curve Upgrades In this whitepaper, we provide our insights about what considerations you need to make to accurately...
How did this wind plant increase its annual revenue? WindESCo was engaged by UPC Renewables to optimize 79 MW of in-warranty turbines under an OEM...
Unlocking the Performance of Assets Under LTSA with WindESCo Greencoat engaged WindESCo to help improve the performance of assets under contract with...